Insulation Blowing / Insulation Blowing Machine
Maintenance Schedule - Gas & Diesel Units
Maintenance Schedule for GAS engine machines.
*These required maintenance procedures should be performed at the frequency stated on the table.
They should also be included as part of any seasonal tune-up. A maintenance log is suggested for proper care.
Perform these maintenance procedures more frequently under extremely dusty, dirty conditions.
Frequency | Maintenance Required |
Daily or Before Starting Engine |
Fill Fuel Tank. |
Every 25 Hours | Service precleaner element. |
Every 100 Hours |
Replace air cleaner element. |
Every 200 Hours |
Check spark plug condition and gap. |
Maintenance Schedule for DIESEL engine machines.
*These required maintenance procedures should be performed at the frequency stated on the table.
They should also be included as part of any seasonal tune-up. A maintenance log is suggested for proper care.
Perform these maintenance procedures more frequently under extremely dusty, dirty conditions.
Frequency | Maintenance Required |
Daily or Before Starting Engine |
Fill fuel tank. |
Every 100 Hours | Replace air cleaner element. Remove cooling shrouds and clean cooling areas. Check oil cooler fins, clean as necessary (if equipped). |
Every 200 Hours | Change oil and air filter. (More frequently under severe conditions) Replace fuel filter. Grease all bearings (if applicable). Replace heavy-duty air cleaner element. |